All Hydro- and Thermal Power Plant in Bulgaria Activated to Compensate for Turned off Reactor of Kozloduy NPP

The Bulgarian Electricity System Operator (ESO) has activated the replacement capacities of all thermal and hydro power plants in the country to compensate for the generation following the automatic shutdown of Unit 5 of the Kozloduy NPP at 1:16 am on 22 January 2021. The ESO ensures stable and uninterrupted functioning of the power generating system, the operator reported.
Earlier, it became clear that Unit 5 of the Kozloduy NPP was switched off minutes after 01:00 am this night after the reactor protection system was activated during a routine operation. The NPP management assured that there is no radiation hazard radioactivity level was within normal boundaries.
Currently work is underway to prepare Unit 5 for restart, planned for the end of the day.
We need your support so Novinite.com can keep delivering news and information about Bulgaria! Thank you!
- » Bulgartransgaz: We will Not Stop the Transit of Russian Gas
- » Study: In Three Years, Electric Trucks will be a Cheaper option than Diesels in Europe
- » The New Gas Price in Bulgaria is almost 14% Higher
- » Finance Minister: Bulgaria’s Economy can Last 6 months if Russia Stops Oil and Closes the Bosphorus
- » Deputy PM: We have Assurance from the EC that Bulgaria will be Included in the Exceptions for the Embargo of Russian Oil
- » PM: Bulgaria will Receive the Entire Amount of Azeri Gas from July 1