Bulgarian Renewable Energy Producers to Alert EC over Grid Access Fee

Bulgarian renewable energy producers have threatened to notify the European Commission that the recently introduced grid access fee constitutes unregulated state aid to power distributors.
Renewable energy producers and industry representatives staged Monday their third protest over the grid access fee in front of the headquarters of the State Commission for Energy and Water Regulation (DKEVR) in Sofia.
The protesters yet again demanded the resignation of DKEVR Chair Angel Semerdzhiev from the parliamentary committee tasked with supervising the watchdog's activity.
Renewable energy producers have insisted the fee for accessing the networks of the three power distributors operating in the country will deprive them of 10-40% of their revenues and will lead to numerous bankruptcies.
Nikola Nikolov from the Bulgarian Photovoltaic Association made clear Monday that the complaints against the DKEVR decision to introduce the grid access fee had already been submitted with the Supreme Administrative Court (VAS).
He added that the complaints would also be filed to the EC Representation in Bulgaria by the end of the week.
A number of renewable electricity producers have threatened they will not sign the contract supplements with the power distributors concerning the grid access fee.
The DKEVR Chair commented that the move was illegal, saying that the renewable electricity producers had to be disconnected from the grid.
The protesters responded by saying that the Chair of the energy watchdog had no such powers.
After failing to arrange a meeting with Angel Semerdzhiev, the protesters headed for the building of the Council of Ministers.
We need your support so Novinite.com can keep delivering news and information about Bulgaria! Thank you!
- » Bulgarian Power Industry Gears up for Green Technologies
- » IEA: Global CO2 Emissions Rise to Worrying Levels after Historic Decline in 2020
- » Clean Energy: Bulgaria between Two Difficult Choices
- » Bulgaria Ranks 8th in EU in Electricity Generated by NPP
- » ContourGlobal Maritsa East 3 TPP Provided Emergency Repair of the Oxygen Supply System at the Municipal Hospital in Galabovo
- » Bulgaria Mulls Building Small Nuclear Reactor