Crossing Borders: Bulgaria's Full Schengen Membership Transforms Travel to Greece and Romania
With Bulgaria's full integration into the Schengen Area, citizens now have the ability to travel freely to neighboring Greece and Romania
Since the activation of the extension of the Turk Stream gas pipeline passing through Bulgarian territory, the revenue generated from reserved capacities and the volume of natural gas transported between Bulgaria's borders with Turkey and Serbia has amounted to BGN 1.308 billion. This figure accounts for the period spanning from January 1, 2022, to March 26, 2024, covering the route between Strandzha2/Malcochlar (at the Turkish border) and Kireevo/Zajecar (Bulgarian/Serbian border), as reported by state gas operator Bulgartransgaz and cited by Mediapool.
Operational costs for maintaining the route, including compressor stations and gas measuring stations, amounted to BGN 44 million. However, this expenditure pales in comparison to the significant returns on investment. Bulgartransgaz invested BGN 2.5 billion (excluding VAT) in constructing the 474-kilometer section, which has already repaid more than half of the initial investment.
The Russian energy giant Gazprom, the primary user of the pipeline, has contributed substantially to these revenues, paying transit fees amounting to BGN 683 million in advance. This financial injection occurred even before the pipeline's construction, indicating the strategic importance of the project for regional energy transit.
The data also reveals operational insights, with nearly 487 million MWh of Russian gas entering Bulgaria through the pipeline, while over 217.7 million MWh have been transported to Serbia. However, operational efficiency remains a consideration, as the pipeline operates at around 83.23% to 93.94% of reserved capacity at various points, leaving a notable portion unfilled.
The gas operator clarifies that the availability of capacity relies on the volume of gas requested for transmission and the corresponding capacities reserved by users. Based on the provided information, it is evident that since the pipeline became operational at the Turkish border, eight companies have secured capacity, while nine have done so at the Serbian border. However, BTG has not disclosed the identities of the additional pipeline users, aside from "Gazprom" and MET, both of which reserved capacity before the commencement of construction.
The gas operator clarifies that the availability of capacity relies on the volume of gas requested for transmission and the corresponding capacities reserved by users. Based on the provided information, it is evident that since the pipeline became operational at the Turkish border, eight companies have secured capacity, while nine have done so at the Serbian border. However, BTG has not disclosed the identities of the additional pipeline users, aside from "Gazprom" and MET, both of which reserved capacity prior to the commencement of construction.
The European Union is increasingly concerned that the president-elect, Donald Trump, might reverse key policies and sanctions implemented by President Joe Biden
In 2025, Turkey has implemented significant increases in toll fees for motor vehicles using its highways
Steve Bannon, the former adviser to U.S. President Donald Trump, has launched a harsh criticism of Elon Musk, the CEO of Tesla and SpaceX
On Monday, Russia reported that nine Ukrainian drones were downed as they attempted to attack the compressor station of the TurkStream
Serbia's President Aleksandar Vucic has proposed his country as a potential venue for a meeting between Russian President Vladimir Putin and the next US president, Donald Trump
Russian forces have reportedly made advancements near eight settlements in Donetsk Oblast
Bulgaria's Perperikon: A European Counterpart to Peru's Machu Picchu
Bulgarians Among EU's Least Frequent Vacationers, Struggling with Affordability